Location: Bukhara region, Romitan district, Gazli city, substation “Zapadnaya”, industrial site “Gazli”
 
______________________________________________________
Pipelayer 90 ton
Chassis type:  caterpillar
 Boom length:  not less than 7m
 Manufactured date:   upper than 01.01.2015y
 Operating mode:  shift work schedule in 1 shift (12h)
 Starting date:  01.02.2025y
 Completion date:  30.03.2025y
Pipelayer 70 ton
 Chassis type:  caterpillar
 Boom length:  not less than 7m
 Manufactured date:  upper than 01.01.2015y
 Operating mode:  shift work schedule in 1 shift (12h)
 Starting date:  20.02.2025y
 Completion date:  30.03.2025y
Excavator
 Chassis type:  caterpillar
 Digging depth:  not less than 7m
 Bucket capacity:  not less than 1.5m3
 Manufactured date:  upper than 01.01.2015y
 Operating mode:  shift work schedule in 1 shift (12h)
 Starting date:  01.02.2025y
 Completion date:  30.03.2025y
Front loader
 Chassis type:  wheel
 Unloading height:  not less than 4m
 Bucket capacity:  not less than 3m3
 Manufactured date:  upper than 01.01.2015y
 Operating mode:  shift work schedule in 1 shift (12h)
 Starting date:  01.02.2025y
 Completion date:  30.03.2025y
Mobile crane 50 ton
 Chassis type:  wheel, 8х4
 Boom length:  not less than 40m
 Max load capacity:  not less than 50 ton
 Operating mode:  shift work schedule in 1 shift (12h)
 Starting date:  20.02.2025y
 Completion date: 05.04.2025y
_____________________________________________________
Application deadline: 20.01.2025y